Skip to main content
OIDA Image Collection
Filters:
Reset 
An advertisement for a 24-hour controlled power hydroelectric dam. The background of the image shows a large dam with a body of water flowing out of it. The dam is located in a desert-like area with rocky cliffs on either side. The sky is blue and there are a few clouds in the distance. The text on the image reads "24-Hour Controlled Power" in bold white letters. Below the text there is a smaller text that reads "The only once-daily extended-release hydromorphone" in smaller blue letters. The overall color scheme of the advertisement is blue white and orange.

Description Generated using AI

An advertisement for a 24-hour controlled power hydroelectric dam. The background of the image shows a large dam with a body of water flowing out of it. The dam is located in a desert-like area with rocky cliffs on either side. The sky is blue and there are a few clouds in the distance. The text on the image reads "24-Hour Controlled Power" in bold white letters. Below the text there is a smaller text that reads "The only once-daily extended-release hydromorphone" in smaller blue letters. The overall color scheme of the advertisement is blue white and orange.

We encourage you to view the image in the context of its source document(s) and cite the source(s) when using these images. However, to cite just this image alone, click the “Cite This Image” button and then paste the copied text.

Information copied to your clipboard:

"An advertisement for a 24-hour controlled power hydroelectric dam. The background of the image shows a large dam with a body of water flowing out of ...